Deprecated: Required parameter $value follows optional parameter $key in /home/arnanp53/public_html/wp-content/plugins/themify-updater/includes/class.cache.php on line 62

Deprecated: Required parameter $verions follows optional parameter $settings in /home/arnanp53/public_html/wp-content/plugins/themify-updater/includes/class.auto.update.php on line 20

Deprecated: Required parameter $license follows optional parameter $settings in /home/arnanp53/public_html/wp-content/plugins/themify-updater/includes/class.auto.update.php on line 20

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the themify-updater domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arnanp53/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the themify domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arnanp53/public_html/wp-includes/functions.php on line 6114
SERVICES – Arnan Pratama Consultants
Skip to content

STAGE OF SERVICES

Concep Design

CONCEPTUAL & SCHEMATIC DESIGN STAGE

  • Conduct review and consultation with Client, Architect
    and other project participants on the construction
    program, architectural conceptual plans
    and in general, the program of requirements.
  • To attend coordination meetings in Jakarta or
    elsewhere as directed by the Owner, the Architect
    or Project Manager
  • To initiate preliminary discussion with the Public
    Utility Companies (Electricity, Water, Sewer,
    Gas, Telecomm, etc.) and Government Authorities
    on matters of principle in connection with
    the design of the works.
  • To establish by comparison, analysis and selection,
    the most suitable and optimum solution for
    all M&E system.
  • To make rough engineering calculations for each
    system to determine basic estimated load requirements.
  • To prepare Conceptual and Schematic Design
    Drawings (single line plans, system diagram, riser
    diagram, etc) and outline specification of all M&E
    system.
  • Provide preliminary information regarding M&E
    space/room requirements such as size and locations
    of equipment room, shafts, chases and
    horizontal distribution spaces.
  • To attend coordination meetings in Jakarta or
    elsewhere as directed by the Owner, the Architect
    or Project Manager.

DESIGN DEVELOPMENT STAGE

  • To establish the M&E design criteria and prepare
    complete engineering calculations.
  • Determination and confirmation of space / room
    required for the M&E services.
  • Provide information on weights of major pieces
    of M&E equipment to the Structural Engineer.
  • To further develop the approved Conceptual and
    Schematic Design in commensurate with the
    work progress of the Architect, Structural Engineer
    and other Consultants.
  • To liaise with Public Utility Companies to agree
    utility connections in regards to power, drainage,
    gas, telephone and water services
Services
electrical design

DETAIL DESIGN AND TENDER DOCUMENT STAGE

  • To prepare the final working drawings detail design
    and specification of tender documentation.
  • The Tender documentation to be prepared in maximum
    3 to 4 M&E tender packages consisting of:
    – General Specification
    – Technical Specification
    – Tender Drawings
  • To sign for certification and submit the design documents
    to the relevant Authorities (TABG) for obtaining
    the necessary approvals and other related
    clearances.
  • To file submission documents and attend meetings
    with TABG, provide clarification/explanation and respond
    queries which may be raised by the TABG
    Expert Team.
  • To do minor revision and to re-submit the drawings
    and documents should such revisions be
    necessary due to Authority’s mandatory requirements.

TENDERING PROCESS STAGE

  • To provide input to the Owner in the process of
    pre-qualification of M&E Contractors.
  • To assist in the Tender Clarification meetings.
  • o assist in tender analysis and bid evaluation on
    technical matters only, including clarification with
    Contractors and Suppliers, where required.
  • To make recommendations for Award of Contract,
    if required.
Tender deal
commisioning

CONSTRUCTION STAGE (PERIODICAL OBSERVATION)

  • Perform periodical observation to assess general
    adherence to design intent and to ensure that the
    works are proceeding in acceptance with the Tender
  • Documents, on an average one visit every month
    during the period of construction
  • Provide assistance in solving design related
    problems, if required.
  • Witnessing commissioning work of completed
    systems or installations, performed by the Contractor.
  • General checking of the quality of the Contractor’s
    work.
  • Assist the Owner in the Handling-Over process.
  • To complete the above mentioned scope of mechanical
    and electrical works PT. Arnan Pratama
    Consultants also provides the following supplementary
    service:
    – full site supervision.