Deprecated: Required parameter $value follows optional parameter $key in /home/arnanp53/public_html/wp-content/plugins/themify-updater/includes/class.cache.php on line 62

Deprecated: Required parameter $verions follows optional parameter $settings in /home/arnanp53/public_html/wp-content/plugins/themify-updater/includes/class.auto.update.php on line 20

Deprecated: Required parameter $license follows optional parameter $settings in /home/arnanp53/public_html/wp-content/plugins/themify-updater/includes/class.auto.update.php on line 20

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the themify-updater domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arnanp53/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the themify domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/arnanp53/public_html/wp-includes/functions.php on line 6114
PROJECTS LIST – Arnan Pratama Consultants
Skip to content

ONGOING AND COMPLETED PROJECTS LIST

NONAMA PROYEKLOCATIONDESIGN START (YEAR)CLIENTARCHITECTBUILDING PROJECTBUILDING PARTICULARS (Luasan)SCOPE OF SERVICESSTATUS
@GRAND OULET BALI (GOB)Bali2022TSME MITRA IV Pte. Ltd.GFA : 72.833 m2
(Phase 1)
MEP Engineering Design Services
@HOTEL DI LABUAN BAJONTT2022PT. Mitra Properti SentosaGFA : 19.000 m2Kerja Tambah MEP
@TCC-1Jakarta2022PT. Langgeng Gemilang SejahteraSLF
@BALI INTERCONTINENTAL HOTEL JIMBARANBali2022GFA : 31.158 m2Audit Instalasi MEP
@PIK 2 D36 TOWN HUBJakarta2022PT. Kapuknaga IndahGFA : 31.158 m2MEP Engineering Design Services
@SHIPYARD – RIVER WALK ISLANDJakarta2022PT. Kukuh Mandiri LestariGFA : 17.623,2 m2MEP Engineering Design Services
@WESTOWN VIEWSurabaya2022PT. Ppro Sampurna JayaKerja Tambah MEP
@NASDEM PLACE DI BATAMBatam2022PT. Arkipuri Intra NasionalGFA : 7.000 m2MEP Engineering Design Services
@HOLIDAY INN KEMAYORANJakarta2022PT. Nusaplaza International HotelSite Area : 8.817 m2
GFA : 35.195 m2
Audit Instalasi MEP
@INDONESIA 1Jakarta2022Constructon StageGFA : 290.891 m2MEP Engineering Design Services
@PURI INDAH MALL EXPANSIONJakarta2022PT. Antilope Madju Puri IndahGFA : 3.144,85 m2MEP Engineering Design Services
@HOTEL IBIS MADIUNMadiun2022PT. Bumi Success JayaMEP Engineering Design Services
@HOTEL PIKJakarta2022PT. Kukuh Mandiri LestariGFA : 15.059,02 m2MEP Engineering Design Services
@CAPITAL SQUAREJakarta2022PT. Trisakti Makmur PersadaKerja Tambah MEP Lantai P8
@DISTRICT 8Jakarta2022PT. Sumber Cipta Griya UtamaReview AC
@ENTERTAINMENT CLUB DI PIK GOLFJakarta2022Bp Junanto SantosoGFA : 3.489 m2MEP Engineering Design
Services
@CAPITAL SQUARESurabaya2022PT. Trisakti Makmur PersadaGFA : 1.125,56 m2Fitting out – Food Court
@HOTEL IBIS RADEN SALEHJakarta2022PT. Jaya Ripta BhuwanaEskalasi Fee Services
@SAT NUSAPERSADABatam2022PT. Sat NusapersadaGFA : 17.000 m2Infra Red Services
@RESIDENTIAL DEVELOPMENT IN KKBBali2022Habitat Properties PteGFA : 17.000 m2MEP Engineering Design
Services
@GEDUNG PERTEMUAN BOJONGSOANGBandung2022PT. Duta Prakarsa LestariGFA : 794,84 m2MEP Engineering Design
Services
@DP MALL EXPANSIONSemarang2022PT. Wijaya Pratama RayaGFA : 56.905 m2MEP Engineering Design
Services
@SUMMARECON MALL BANDUNG PHASE 2Bandung2022PT. Summarecon Agung TbkGFA : 34.414 m2MEP Engineering Design
Services
@BIGB EXISTING RENOVATIONBali2022PT. Citra Jimbaran Indah HotelGFA : 1.355 m2Kerja Tambah MEP
@FITTING OUT KUTA BEACH CLUBBali2022KAJA GroupGFA : 3.282 m2MEP Engineering Design
Services
@CAPITAL SQUARESurabaya2022PT. Trisakti Makmur PersadaGFA : 7.317,503 m2Kerja Tambah MEP Retail
@EAST ENTRANCE PIMJakarta2022PT. Metropolitan KentjanaGFA : 8.639,6MEP Engineering Design
Services
@K-TOWNTangerang2022PT. Sentra Berkat MajuGFA : 20.000 m2MEP Engineering Design
Services
@PURI PARK (PIM EXTENSION)Jakarta2022PT. Metropolitan KentjanaGFA : 57.794 m2MEP Engineering Design
Services
@CAPITAL SQUARESurabaya2022PT. Trisakti Makmur PersadaGFA : 26.704,45 m2Kerja Tambah MEP Office to Apartment
@HOTEL DI LABUAN BAJONTT2022PT. Mitra Properti SentosaGFA : 18.300 m2MEP Engineering Design
Services
@RESIDENCE AT JL. SUWIRYOJakarta2022Ibu Theresa WienathanGFA : 1.598,9 m2MEP Engineering Design
Services
@PT TROCON INDAH PERKASAMuara Karang, Jakarta2021Design 9Lantai GF: 303 m2,
Lantai 1 – 2 : 313 m2, Lantai 3: 297 m2, Lantai
4: 297 m2, Lantai 5: 297 m2, Lantai 6: 297 m2,
Lantai 7: 202 m2, Parkir: 147 m2, GFA: 2.153 m2
MEP Engineering Design
Services
Tender Document Stage
@GEDUNG IT & OPERATIONS WIJAYA
KUSUMA
Jakarta2019PT Bank Mandiri (Persero), TbkPT Anggara ArchiteamLuas Lahan: 7.700
m2, Luas Bangunan Kantor: 25.417 m2, Luas
Lahan Parkir: 6.857 m2
MEP Engineering Design
Services
Tender Document
@GEDUNG DANA GRAHA BATAMBatam2019PT Bank Mandiri (Persero), TbkLuas Lahan :
2.330,63 m2, Luas Bangunan : 4.392,66 m2
MEP Engineering Design
Services
Tender Document
@KALBE TOWERJakarta2019PT. Kalbe Farma, TbkPT Duta Cermat MandiriOffice: 40.736 sqm,
Auditorium: 4.138 sqm, M&E dan Core M&E:
10.886 sqm, Parkir: 20.279 sqm
MEP Engineering Design ServicesDesign Development Stage
@SYARIAH FINANCIAL TWIN TOWERJakarta2019Agung Sedayu GroupPT. Anggara ArchiteamGFA : 145.365 sqmMEP Engineering Design
Services
Construction Stage
@SINARMAS TOWERJl. MH Thamrin No.22, Jakarta2019PT. Panji Ratu JakartaPT Anggara ArchiteamSite Area: 4.155
sqm, Parking: 17.870 sqm, MEP: 4.683 sqm,
Office: 35.465 sqm, Retail: 6.002 sqm, Other:
3.477 sqm, GFA: 72.000 sqm
MEP Engineering Design
Services
Tender Document Stage
@DSN OFFICE BUILDINGJakarta2018PT. Tatamulia Nusantara IndahPT. Duta Cermat MandiriBasement 1: 3.049 sqm
Basement 2: 3.614 sqm
Ground: 2.301 sqm
Level 1 (Office): 2.267 sqm
Level 2 (Office): 2.627 sqm
Level 3 (Office): 2.627 sqm
Level Atap: 171 sqm
Luas Dasar Hijau: 4383 sqm
MEP Engineering Design
Services
Construction Stage
@BCA KCU ForestaTangerang, Banten2017PT. Bank Central Asia, tbkPT John & AssociatesTotal Gross Floor
Area: 55.134 sqm, Site: 7.396 sqm, Basement: 1,
2 8.190 sqm, Lantai 1 (Operasional Bank): 2.409
sqm, Lantai 2, 3, 4 (Parkir Mobil): 8.607 sqm,
Lantai 5, 6, 7, 8 (Office): 10.356 sqm, Lantai 9,
10, 11, 12: 9.456 sqm, Lantai 13, 14, 15, 16
(Office): 8.120 sqm
MEP Engineering Design
Services
Completed
@M-TOWN OFFICE SERPONGGading, Serpong, Tangerang2015PT. Summarecon Agung, TbkPT. Anggara ArchiteamGFA : 89.625 sqmMEP Engineering Design ServicesTender Document Stage
@GREEN OFFICE PARK 1BSD City, Tangerang2015PT. Sinarmas LandPomeroy/PT. ArkoninGFA : 66.922,79 sqmMEP Engineering Design
Services
Completed
@TCC BATAVIA TOWER TWOJakarta2014PT. Greenwood Sejahtera, TbkPT. Anggara ArchiteamGFA : 168.980 sqmMEP Engineering Design
Services
Tender Document Stage
@SAMPOERNA STRATEGIC SQUAREJakarta2013PT. Buana SaktiGFA : 357.167 sqmMEP Engineering Design
Services
Tender Document Stage
@THAMRIN OFFICEJakarta2012PT. Lippo Karawaci TbkDP Architects/PT. QuadraturaGFA : 37.165 sqmMEP Engineering Design
Services
Construction Stage
@SENOPATI – 2Jakarta2012PT. Sumber Cipta GriyaGFA : 489.833 sqmMEP Engineering Design
Services
Completed
@JAKARTA BOX TOWERJakartaPT. Mardhika Artha UpayaPT. Duta Cermat MandiriGFA : 64.515 sqmMEP Engineering Design
Services
Completed
@SATRIO OFFICE TOWER
DI JL. PROF. DR. SATRIO NO. 19
Jakarta2012PT. Mitra Pertala PerkasaPT. Pandega Desain WeharimaGFA : + 37.000,36 sqmMEP Engineering Design ServicesCompleted
@METROPOLITAN TOWERJakarta2012PT. Metropolitan DevelopmentPT. Perentjana DjajaGFA : 64.201 sqmMEP Engineering Design
Services
Completed
@SOPO DEL OFFICE TOWER (NEW)Jakarta2012PT. Toba Pengembang SejahteraPT. Airmas AsriGFA : 180.435 sqmMEP Engineering Design
Services
Completed
@TELKOM LANDMARK TOWERJakarta2012PT. Telkom Landmark TowerPT. Airmas AsriGFA : + 180.000 sqmMEP Engineering Design
Services
Completed
@SUNTER OFFICE PARKJakarta2012PT. Sinar Grahamas LestariGFA : 124.550 sqmMEP Engineering Design
Services
Construction Stage
@SOPO DEL OFFICE TOWER (OLD)Jakarta2011PT. Toba Pengembang SejahteraPT. Airmas AsriGFA : 108.924 sqmMEP Engineering Design
Services
Completed
@THE CITY CENTER - TOWER ONEJakarta2009PT. Greenwood SejahteraPT. ArkoninGFA : 123.000 sqmMEP Engineering Design
Services
Completed
@CHASE TOWERJakarta2009PT. Duta Anggada RealtyGfa : 87.755 sqmMEP Engineering Design
Services
Completed
@TEMPO SCAN TOWERJakarta2008PT. Nagadi WalujoPT Arquitechtonika/HadipranaGfa : 68.549 m2MEP Engineering Design
Services
Completed
@LIFE TOWERJakarta2007PT. Lippo Karawaci Tbk.GFA : 56.683 sqmMEP Engineering Design
Services
Completed
@CYBER ANNEXJakarta2007PT. Karyagraha NusantaraGFA : 17.776,6 sqmMEP Engineering Design
Services
Completed
@MENARA BCA HEAD QUARTERJakarta2006PT. Bank Central Asia TbkPT. Anggara ArchiteamGFA : 29,000 m2MEP Engineering Design
Fitting Out for Head Quarter
BCA ( 19 Floor )
Completed
@CYBER TWOJakarta2006PT. Karyabangun NusantaraGFA : 87.500 sqmMEP Engineering Design
Services
Completed
@JAKARTA CITY TOWERJakarta2006PT. Kencana Graha MandiriDP Architects/PT. ArkoninGFA : 83.000 sqmMEP Engineering Design
Services
Completed
@SENAYAN OFFICE TOWER 2Jakarta2005PT. Senayan Trikarya SempanaPT Kajima CorporationGFA : 59.000 sqmMEP Engineering Design
Services
Completed
@MENARA STANDARD CHARTEREDJakarta2004PT.Chitatex PeniGFA : 68.880 sqmMEP Engineering Design ServicesCompleted
@SENAYAN OFFICE TOWERJakarta1995Senayan Trikarya SempanaGFA : 57.500 m2MEP Engineering Design
Services
Completed
@JAKARTA STOCK EXCHANGE BUILDINGJakarta1992PT. Danayasa ArthatamaBrennan Beer Gorman/PT. ArkoninGFA : 170.000 m2MEP Engineering Design
Services
Completed
@DANAMON LANDJakarta1992PT. Danamon LandPT ArkoninGFA : 100.000 m2MEP Engineering Design
Services
Completed
@BII OFFICE TOWERJakarta1992PT. Duta PertiwiPaul RudolfGFA : 60.000 m2MEP Engineering Design
Services and Supervision
Completed
@BAPINDO HEAD OFFICEJakarta1991PT. Duta Anggada RealtyGFA : 100.000 m2MEP Engineering Design
Services and Supervision
Completed
@SAPTA PESONA OFFICE BUILDINGJakarta1991Dept. Pariwisata, Pos & TelekomunikasiGFA: 36.000 m2MEP Engineering Design
Services
Completed
@ALOFT HOTEL SEMINYAK - EXTENSIONCibeureum, Cimahi Selatan2021PT Royal Perdana GemilangPT Duta Cermat MandiriSite Area: 2.398 m2, Total
GFA: 10.045 m2
MEP Engineering Design ServicesConceptual Design Stage
@THE LUXURY COLLECTION JIMBARANJimbaran – Bali2020PT Bukit Lentera SejahteraDonton Corker MarshallSite Area : 15,000
m2, GFA : 8,500 m2 ~ 10,000 m2
MEP Engineering Design
Services
Design Development Stage
@HOTEL INDIGO PIK – 2Jakarta2020PT Agung Sedayu GroupPT. Andra MartinSite Area: 13,040 m2MEP Engineering Design
Services
Conceptual Design Stage
@PESONA ALAM CISARUA HOTEL – 04A
(AR+OTEL)
Cisarua, Bogor – Jawa Barat2020PT Kusuma Anugrah Damai SejahteraPT. Bias Tekno Art KreasindoGFA 20.566, 64 m2MEP Engineering Design ServicesTender Document Stage
@HOTEL ONE INDONESIA YOGYAKARTAYogyakarta2019Paramont LandHadipranaSite Area : 11.146
m2, GFA : 17.000 m2
MEP Engineering Design ServicesTABG Document
@MANADO SKYLINEManado2019PT Dhanistha Investama IndonesiaONG & ONGSite Area : 12,4 HaMEP Engineering Design
Services
Design Development Stage
@HOTEL & WATERPARK KALAWAT -
MANADO
Manado2019PT. Dhanista Investama IndonesiaONG & ONGSite Area: + 16 Ha, Total
GFA: 86.815 m2
MEP Engineering Design
Services
Conceptual Design Stage
@AYANA ART GALLERYBali2019PT Karang Mas SejahteraPT. PTI ArchitectsSite Area: 4.375 m2, Luas
Lahan: 26.700 m2, Luas lahan retail, pond, parkir
bus: 10.240,1 m2, Luas pathway dan jalan area
retail: 16.459,9 m2
MEP Engineering Design
Services
Tender Document Stage
@PESONA ALAM CISARUA HOTEL – 02A
(DOUBLE TREE)
Bogor, Jawa Barat2019PT. Kusuma Anugerah Damai IndonesiaPT. Bias Tekno Art KreasindoSite Area: 276.284 sqm, GFA:
20.851,46 sqm
MEP Engineering Design
Services
Design Development Stage
@HOTEL TERASKITA ACEHAceh2019PT. Waskita Karya RealtyPT Lalascipta Architects InternusaGFH 7.454,37 sqmMEP Engineering Design
Services
Tender Document Stage
@COURTYARD BY MARRIOTT BALI UBUD
RESORT
Bali2019PT. Pesona Nirwana NusantaraGFA : 19.542 m2MEP Engineering Design ServicesDesign Development Stage
@HURUN BEACH RESORT LAMPUNGLampung2019PT. Tarika Nirmana HurunPT Duta Cermat MandiriGFA : 16.696 m2MEP Engineering Design ServicesConstruction Stage
@DISCOVERY KARTIKA PLAZA HOTEL BALIBali2019PT. Kharisma Arya PaksiGFA : 24.723 m2MEP Engineering Design ServicesConceptual Design Stage
@BANYAN TREEE NIPAH LOMBOKLombok2019PT. Lombok Sukses BersamaPT. HadipranaGFA : 119.600 sqmMEP Engineering Design
Services
Tender Document Stage
@DAGO PAKAR HOTEL AND SUITES
DAGO PAKAR GOLF RESORT BANDUNG
Bandung2019PT. Bandung PakarPT. Duta Cermat MandiriGFA : 31.244,32 m2MEP Engineering Design
Services
Tender Document Stage
@CLUB HOUSE PIKJakarta2018PT. Kapuk Niaga IndahPT. HadipranaGFA : 6.658 m2MEP Engineering Design
Services
Construction Stage
@IBIS HOTEL MADIUNMadiun2018PT. Bumi Success Jaya GFA : 10.970 m2MEP Engineering Design
Services
Tender Document
@POTATO HEAD HOTEL BALIBali2018PT. Total Bangun Persada, TbkGFA : 27.676 m2MEP Engineering Design
Services
Completed
@HOTEL AYANA NORTH WINGBali2017PT. Karang Mas SejahteraPT. Anggara ArchiteamGFA : 35.487 m2MEP Engineering Design
Services
Tender Document
@ALILA LOMBOKBali2017URBNarcGFA : 50.675 sqmMEP Engineering Design
Services
Tender Document
@SARI PACIFIC HOTEL RENOVATIONJakarta2017PT. Sariarthamas Hotel InternationalPT. Airmas AsriGFA : 33.000 sqmMEP Engineering Design
Services
Construction Stage Phase – 1
@ANDARIN RESIDENCEBali2017PT. Bali Raga WisataGFA : 14432 sqmMEP Engineering Design
Services
On – Hold
@SHERATON BELITUNGBelitung2016PT. Enimraya Hydro PowerGFA : 9.960 m2MEP Engineering Design ServicesConstruction Stage
@JUMEIRAH HOTEL BALIPecatu, Bali2015PT Asia Pasifik PropertiPT Grounds Kent Architects Indonesia80 Suites Hotel: 24
Private Villas, Back of House / Restaurant, Total
GFA : 4 Ha
MEP Engineering Design
Services
Construction Stage
@SAHID KUTA LEISURE RESORT
PHASE 2
Bali2015PT. Indonesian Paradise Property TbkPT EnvirotecGFA : 10.351 m2MEP Engineering Design ServicesConstruction Stage
@IBIS RADEN SALEHJl. Raden Saleh, Jakarta2014PT. Jaya Ripta BhuwanaDotlineshapeGFA Include Parking : 8.288 sqm, GFA:
15.953 sqm
MEP Engineering Design ServicesConstruction Stage
@IBIS JL. JAKSAJakarta2014PT. Sejahtera Makmur LestariGFA : 8.887 sqmMEP Engineering Design
Services
Tender Document Stage
@FOUR POINT HOTELSurabaya2014PT. Pakuwon DjatiGFA : 15.953 sqmMEP Engineering Design
Services
Completed
@IBIS TANAH ABANGJakarta2014PT. Wisma Graha MDGFA : 4.374,74 sqmMEP Engineering Design ServicesCompleted
@SIX SENSE RESORT ULUWATUBali2014PT. PTI ArchitectsGFA : 83.640 sqmMEP Engineering Design
Services
Completed
@SATORIA TOWERSurabaya2014PT. Satoria PropertyGFA : 42.492 sqmMEP Engineering Design
Services
Construction Stage
@MERCURE HOTEL BERAUBerau2014PT. Berau Indah PermaiGFA : 9.774 sqmMEP Engineering Design
Services
Completed
@IBIS CIREBONCirebon2014PT. Sejahtera Makmur LestariGFA : 8.000 sqmMEP Engineering Design
Services
Conceptual Design Stage
@HOTEL & VILLA DREAMLAND PECATUBali2014PT. Satoria PropertyGFA : 42.066 sqmMEP Engineering Design
Services
Tender Document Stage
@HILTON DI BAHANA TOWERJakarta2014PT. Bahanasemesta CitranusantaraGFA : 100.550 sqmMEP Engineering Design
Services
Tender Document Stage
@CONDO & HOTEL DI KARET PEDURENANJakarta2014PT. Bahanasemesta CitranusantaraGFA : 112.500 sqmMEP Engineering Design
Services
Tender Document Stage
@CITYLOFT GAJAHMADAJakarta2013PT. Duta Anggada RealtyGFA : 60.089 sqmMEP Engineering Design
Services
Completed
@KATAMAMA PROJECTBali2013PT. Isa DevelopmentGFA : 11.000 sqmMEP Engineering Design
Services
Completed
@HOTEL LUWIH GIANYARBali2013AviatourGFA : 12.117,55 sqmMEP Engineering Design
Services
Completed
@MIDTOWN HOTELJakarta2013PT. Kharisma Citra AnugrahGFA : 8.182 sqmMEP Engineering Design
Services
Completed
@4 STARS HOTEL – JIMBARANBali2012PT. Karang Mas SejahteraGFA : 14.767,5 sqmMEP Engineering Design
Services
Completed
@JW MARRIOT AT KEMANG VILLAGEJakarta2011PT. Lippo Karawaci, Tbk.GFA : 37.619,53 sqmMEP Engineering Design
Services
Tender Document
@HOTEL 101 DHARMAWANGSAJakarta2011PT. Visi Utama IndonesiaGFA : 7.800 sqmMEP Engineering Design
Services
Completed
@ASTON PRIORITY SIMATUPANGJakarta2011PT. Nusa Pratama PropertyGFA : 18.575 sqmMEP Engineering Design
Services
Completed
@ALILA RESORT SEMINYAKJakarta2011PT. Anaamaya DevelopmentGFA : 28.119 sqmMEP Engineering Design
Services
Completed
@RESOR SEMINYAKB a l i2009PT. Curahemas LestariGFA : 11.589 sqmMEP Engineering Design
Services
Completed
@REGENT BALI SANURB a l i2009PT. Pancaran Kreasi PrimaGFA : 25.000 sqmMEP Engineering Design
Services
Completed
@INTERCONTINENTAL BALI SANUR
RESORTS
B a l i2008PT. Restu MaharaniGFA : 36.902 sqmMEP Engineering Design
Services
Completed
@AMARTHA RAFFLES RESORT HOTELB a l i2007PT. Asia Pasifik PropertiGFA : 17.171 sqmMEP Engineering Design
Services
Completed
@BVLGARI RESIDENCEB a l i2007PT. Jimbaran Villas5 Villas each consist Of 5 keysMEP Engineering Design
Services
Completed
@HOLIDAY INN – JAKARTAJakarta2006PT. Nusaplaza IndahGFA : 36,775 m2MEP Engineering Design
Services
Completed
@MARRIOT HOTEL MEDANMedan2005PT. Kurnia Tetap MuliaGFA : 75.000 sqmMEP Engineering Design
Services
Completed
@ST. REGIS HOTEL NUSA DUA, BALIBali2004PT. Pacific Resort Buana IndonesiaMEP Engineering Design
Services
Completed
@HOTEL SANTIKAMalang2002PT. Grahawita SantikaGFA : 6.088 sqmMEP Engineering Design
Services
Completed
@RITZ CARLTON HOTELBali2001PT. Karang Mas SejahteraGFA : 6.000 m2MEP Engineering Design
Services
Completed
@GRAND MERCURE MAHAKAMJakarta1995Mahakam Eka Graha170 RoomsMEP Engineering Design
Services
Completed
@ARYADUTA HOTELRiau1995PT. Hotel Prapatan171 RoomsMEP Engineering Design
Services
Completed
@PUSAKO HOTELBukit Tinggi1989 - 1992PT. Parama Loka Consultants152 RoomsMEP Engineering Design
Services
Completed
@RED TOP SQUAREJakarta1993PT. Sanggraha Dhika400 Rooms (Hotel), 280 Units
(Apartment)
MEP Engineering Design
Services
Completed
@MANGGA DUA HOTEL & SHOPPING
COMPLEX
Jakarta1993PT. Duta Pertiwi400 Rooms (Hotel), GFA :
10.650 sqm (Mall)
MEP Engineering Design ServicesCompleted
@TRAVELODGE HOTEL ANCOLJakarta1993Shimizu CorporationGFA : 20.600 sqmMEP Engineering Design
Services
Completed
@IBIS HOTELJakarta1992PT. Putra Swadaya Prasetya350 RoomsOwner’s Advisor and Site
Supervision
Completed
@SAWANGAN NIKKO HOTELBali1992PT. Catarison Sukses430 RoomsMEP Engineering Design
Services
Completed
@PUROSANI HOTELYogyakarta1990PT. Surya Raya Idaman300 RoomsMEP Engineering Design
Services
Completed
@SHANGRI-LA HOTELJakarta1990PT. Kerry Properties Ltd.825 RoomsMEP Engineering Design ServicesCompleted
@DAICHI HOTELJakarta1989 – 1992PT. Indokisar Jaya152 RoomsMEP Engineering Design ServicesCompleted
@SHERATON LAGOON, NUSA DUA BEACHNusa Dua Bali1989 – 1990PT. Karya Agung Kisma Lestari400 RoomsMEP Engineering Design ServicesCompleted
@SANUR BEACH HOTELBali1989 – 1990PT. Aerowisata146 RoomsMEP Engineering Design ServicesCompleted
@NUSA INDAH HOTEL & CONVENTION
CENTER
Nusa Dua Bali1989 – 1991PT. Aerowisata400 RoomsMEP Engineering Design ServicesCompleted
@GRAND HOTEL PREANGERBandung1988 – 1990PT. Aerowisata158 RoomsMEP Engineering Design
Services
Completed
@THE HYATT ARYADUTA HOTELJakarta1984 – 1986PT. Hotel Prapatan190 RoomsSupervisionCompleted
@BSD INTERMODA MIXED COMMUNITYSerpong Tangerang2021PT Bumi Serpong DamaiPT. Anggara ArchiteamGFA 1.050 m2M&E Engineering Design ServicesConceptual Design Stage
@APARTMENT AMBERTREELebak Bulus, Jakarta Selatan2020PT. Ambertree Development JakartaPT Pandega DesainTotal CFA : 14.806 m2MEP Engineering Design
Services
Conceptual Design Stage
@BRANZ MEGA KUNINGAN – KONDOTELJakarta2019Shimizu CorporationPT. Anggara ArchiteamGFA : 32,057 m2MEP Engineering Design
Services
Construction Stage
@MA-ZHOJIDepok, Jawa Barat2019PT. PP Properti TbkGFA : 32,057 m2MEP Engineering Design
Services
Tender Document Stage
@APARTMENT KYO DOCIETY - PANJANG
JIWO
Surabaya2019PT. Tanrise Jaya IndonesiaGFA : 38.658,84 m2
GFA, Landscape dan atap : 40.318,00 m2
GFA, Landscape, atap dan fasilitas : 41.963,00 m2
MEP Engineering Design
Services
Tender Document Stage
@MEIKARTA LIPPO CIKARANGCikarang - Jawa Barat2019PT. Mahkota Sentosa UtamaTYPE A – B & T – T
A. Tower A – B
GFA : 57.102 m2
B. Tower T – T
GFA : 58.138 m2
MEP Engineering Design ServicesCompleted
@TOKYU LAND – PURI BOTANICALPuri Botanical, Jakarta Barat2018PT. Tokyu Land IndonesiaGFA : 86.000 sqmMEP Engineering Design ServicesTender Document Stage
@NUVASA BAYBatam2017PT Sinarmas LandPT Prima Detailindo33,254.98m2MEP Engineering Design ServiceConstruction Stage
@WESTOWN VIEW TOWER 2Wiyung -Surabaya2017PT. PP Properti, tbkGFA : 36.510 sqmMEP Engineering Design
Services
Tender Document Stage
@BRANZ BSD PHASE IITangerang2017PT. Tokyu Land IndonesiaGFA : 390.000 m2MEP Engineering Design
Services
Schematic Design Stage
@MEIKARTA LIPPO CIKARANGCikarang -Jawa Barat2017PT. Lippo Cikarang, tbkGFA Meikarta BA Tower : 67.308,08 m2
GFA Meikarta BB Tower : 78.015,40 m2
MEP Engineering Design
Services (Technical Advisor)
Completed
@DE VONTECinere – Depok2017PT. Megapolitan DevelopmentGFA : 28.487,77 m2MEP Engineering Design
Services
Design Development Stage
@ARANDRA RESIDENCECempaka Putih, Jakarta Putih2016PT. Cempaka Sinergy RealtyGFA : 170.000 m2M&E Engineering Design ServicesConstruction Stage
@KAMALA KANDARABekasi2016PT. PP Properti TbkGFA : 89.609 sqmM&E Engineering Design ServicesConceptual Design Stage
@SPRINGLAKE APARTMENTS
PHASE 3 DEVELOPMENT
Bekasi2014PT. Summarecon Agung, Tbk.GFA : 130.213 sqmM&E Engineering Design ServicesCompleted
@DISCOVERY ANCOLJakarta2014PT. Marina Ancol Green HotelGFA : 72.071 sqmMEP Engineering Design ServicesCompleted
@WEST VISTAJakarta2014PT. Kepland InvestamaGFA: 167.770 sqmMEP Engineering Design ServicesCompleted
@TAMAN PERMATA BUANAJakarta2013PT. Sinarmas LandGFA : 124.559 sqmMEP Engineering Design
Services
Construction Stage
@AMERTHA PONDOK INDAHJakarta2012PT. Selaras Mitra SejatiGFA : 94.108 sqmMEP Engineering Design
Services
Preliminary Design Stage
@SENOPATI – 2 (LOT 28)Jakarta2012PT. Sumber Cipta GriyaGFA : 489.833 sqmMEP Engineering Design
Services
Completed
@MENTENG PARKJakarta2012PT. Cempaka Wenang JayaGFA : 155.578,34 sqmMEP Engineering Design
Services
Completed
@ANCOL CONDOMINIUMJakarta2012PT. Jaya Realty Property, TbkGFA Condo: 178.710 sqm
GFA Double Decker : 38.438 sqm
MEP Engineering Design
Services
Completed
@SENTOSA RESIDENCEJakarta2011PT. Cempaka Sinergy RealtyGFA : 106.505 sqmMEP Engineering Design
Services
Completed
@KEMANG RESIDENCEJakarta2011PT. MidPlaza PrimaGFA : 112.393,20 sqmMEP Engineering Design
Services
Design Development Stage
@SHERWOOD RESIDENCEJl. Kelapa Nias, Kelapa Gading,
Jakarta
2010PT Sumarecon Agung, TbkPT. Anggara ArchiteamGFA 50.182,21 sqmMEP Engineering Design
Services
Completed
@THE MANSION AT KEMANGJakarta2008PT. Cipta Indah MegahGFA : 55.713 sqmMEP Engineering Design
Services
Completed
@GALERIA GLODOKJakarta2005PT. Duta Anggada Realty Tbk.GFA : 85.702 sqmMEP Engineering Design
Services
Completed
@THE ADHIWANGSA RESIDENCESurabaya2005PT. Adhibaladika AgungGFA : 205.092 sqmM&E Engineering Design ServicesCompleted
@ESSENCE OF DHARMAWANGSA
APARTMENT
Jakarta2005PT. Prakarsa Semesta AlamPT. Urban Architects Co., LtdGFA: 124.577 sqmMEP Engineering Design ServicesCompleted
@THE VIEW RESIDENCESJakarta2006PT. Jakarta Kemayoran PropertiGFA : 61.328 sqmMEP Engineering Design ServicesCompleted
@C B D PLUIT PHASE IJakarta2006PT. Griya Mas SejatiGFA : 189.449 sqmMEP Engineering Design ServicesCompleted
@THE CAPITAL RESIDENCESJakarta2008PT. Graha PutranusaGFA : 91.750 sqmMEP Engineering Design ServicesCompleted
@THE PEAK APARTMENTJakarta2006PT. Graha TunasmekarPT. Airmas AsriGFA : 111.000 sqmMEP Engineering Design
Services
Completed
@THE BELLAGIO MANSION – MEGA
KUNINGAN
Jakarta2006PT. Centra Lingga PerkasaGFA : 23.835,70 sqmMEP Engineering Design
Services
Completed
@KELAPA GADING SQUAREJakarta2005PT. Makmur Jaya SerasiGFA : 439.336 sqmMEP Engineering Design
Services
Completed
@FX. SUDIRMANJakarta2002 - 2003PT. Ray White Project ManagementGFA : 124.090 sqmMEP Engineering Design
Services
Completed
@SIMPRUK TOWERJakarta1995PT. Alvinta Sunta2 towers; 32 Floors; 236 unitsEngineering Design & TenderingCompleted
@BONAVISTA APARTMENTJakarta1995PT. Tri Panoto Sri4 Towers; 32 Floors; 674 unitsEngineering Design ServicesCompleted
@CONDOMINIUM/APART. DEV. SUN FLOWERSurabaya1995PT. Prasidha Inti JayaCondominium & Apartments 4
Towers ; 1.100 units
Engineering Design ServicesCompleted
@APARTMENT PASAR MINGGUJakarta1995PT. Dong Bang DevelopmentApartments 2 Blocks @ 40 unitsEngineering Design Services
and Tendering
Completed
@KUNINGAN LOTS 5&6 (EMPIRE COURT)Jakarta1995PT. Kuningan PropertamaApartments & Office Building (2
Towers), 32 Floors, 400 units
Engineering Design Services
Tendering and Supervision
Completed
@WESTWOOD TOWERSJakarta1993PT. Aneka Elok Real EstateGFA : 62.284 sqmLocal Engineering Design
Services and Tendering
Completed
@SIMPRUK TOWERJakarta1993PT. Pacific Adhika InternusaGFA : 48.200 sqmLocal Engineering Design
Tendering and Supervision
Completed
@ROXY MASJakarta1993PT. Duta PertiwiGFA : 76.598 sqmEngineering Design and
Tendering
Completed
@REDTOP SQUARE APARTMENTSJakarta1993PT. Sanggraha Dhika280 UnitsLocal Engineering Design
Services
Completed
@HOLLYWOOD HILL APARTMENTSMedan1993Lippoland Development50 units ; 7 FloorsLocal Engineering Design
Services
Completed
@TALI RAYA APARTMENTSJakarta1993PT. Airmas AsriGFA : 27.000 sqmEngineering Design Services
Tendering and Periodical Observation
Completed
@MANGGA DUA COURT APARTMENTSJakarta1992PT. Duta Pertiwi2 Towers @ 16 FloorDrawing Review &
Comments
Completed
@NUSA DUA DELUXE APARTMENTSBali1991PT. Atelier 624 DuplexEngineering Design Services
Tendering and Supervision
Completed
@KSK SOHO- KUNINGANJakarta2020PT Kusuma Sentral KencanaAedas Pte Ltd/PT. Anggara Architeam82.803 sqmMEP Engineering Design ServicesDesign Development Stage
@PAMULANG MIXED USE DEVELOPMENTJakarta2019PT. Metroplitan Kentjana, TbkPT. ArkoninGFA : 286,055 sqmMEP Engineering Design ServicesConceptual Design Stage
@LEBAK BULUS MIXED USE DEVELOPMENTJakarta2019PT. Metroplitan Kentjana, TbkPT. Airmas AsriGFA : 176.040 sqmM&E Engineering Design ServicesDesign Development Stage
@HOLLAND VILLAGE JAKARTA (CEMPAKA
PUTIH MIXED USE)
Jakarta2019PT. Lippo Karawaci, TbkPT. Quadratura IndonesiaGFA : 236.808 sqmMEP Engineering Design
Services
Construction Document
@VICTORIA PLAZA AMBONAmbon, Maluku2019PT Kencana Graha MandiriPT PTI ArchitectsSite Area: 16.465
m2, Mall: 34.547,37 m2, Hotel: 14.538,72 m2,
PARKIR : 12.295,06 m2, Total GFA: 61.381,15 m2
MEP Engineering Design
Services
Design Development Stage
@SURABAYA GUBENG MIXED
DEVELOPMENT
Surabaya2018PT. Saputra KaryaGFA : 90.987 sqmM&E Engineering Design ServicesConceptual Design Stage
@ORANGE COUNTYCikarang - Jawa Barat2017PT. Lippo Cikarang, Tbk.Mithubishi Jisho Sekkei/PT.
Quadratura Indonesia
GFA : + 220.000 sqmMEP Engineering Design
Services
Tender Document Stage
@ONE PARC PURIJakarta2016J Roger Preston (S) PTE, LTEP&T Consultant Pte Ltd/PT. Prima
Detailindo
GFA : 84.396 sqmMEP Engineering Design ServicesTender Document Stage
@THE STADIUM JABABEKACikarang - Jawa Barat2016PT. Midplaza PrimaGFA : 63.783 sqmMEP Engineering Design
Services
Tender Document Stage
@SUMMARECON MALL & HOTEL BANDUNGBandung2016PT. Cempaka Sinergy RealtyCadiz Internasional/PT Anggara
Architeam
Total GFA 100.784 sqm
- Phase 1 52.685 sqm
- Gross Floor Area Mall - 3 floors 67.182 sqm
- Gross Floor Area F&B Pads (3 units) 3.456 sqm
- Gross Floor Area Hotel - 22 floors 25.556 sqm
- Gross Floor Area Parking 51.106 sqm
Including Basement
MEP Engineering Design
Services
Tender Document
@GREEN SEDAYU (TAMAN PALEM)Cengkareng - Jakarta2014PT. Cempaka Sinergy RealtyAirmas AsriGFA : 194.296,70 sqmMEP Engineering Design ServicesCompleted
@FATMAWATI MIXED USEJakarta2014PT. MekaelsaPandega Desain WeharimaGFA : 566.100 sqmMEP Engineering Design ServicesConstruction Stage
@CINERE MIXED USE DEVELOPMENTJakarta2014PT. Lippo Karawaci, Tbk.GFA : 45.072 sqmMEP Engineering Design ServicesConstruction Stage
@CIPUTRA WORLD STAGE 3 & 5Surabaya2016Ciputra GroupGFA : 232.453 sqmMEP Engineering Design
Services
Construction Stage
@SEDAYU CITY @ KELAPA GADINGJakarta2014Agung Sedayu GroupLuas Lahan untuk Phase 1 dan
Phase 2: 81.198 sqm
PHASE – 1
- 6 Tower Suite ( tipikal @ 42 lantai ) : 261.631
m2 81.198 sqm
1 Tower Condo: 52.300 sqm
Lifestyle Mall ( 2 Lantai ) : 25.000 sqm
- Basement Parking ( 4 lantai ) 137.000 sqm
- Tower C
Basement
PHASE – 2
- 2 Tower Suite B ( tipikal ): 102.608 sqm
- 2 Tower Suite C ( tipikal ) : 101.648 sqm
- 1 Tower COndo: 52.300 sqm
- Basement Parking ( 4 lantai ): 113.000 sqm
MEP Engineering Design ServicesConstruction Stage
@INDONESIA 1 TOWER PROJECTJakarta2013PT. MeinhardtPT. Anggara ArchiteamGFA : 191.657 sqmMEP Engineering Design
Services
Construction Stage
@SUPERBLOCK A. YANISurabaya2013PT. Trikarya Graha UtamaGFA : 151.666 sqmMEP Engineering Design ServicesTendering
@CAPITAL SQUARESurabaya2013PT. Trisakti Makmur PersadaPT. Anggara ArchiteamGFA : 157.010 sqmMEP Engineering Design ServicesTender Document Stage
@ONE GALAXYSurabaya2013PT. Sinar GalaxyPT. Perentjana DjajaGFA: 420.129 sqmMEP Engineering Design
Services
Construction Stage
@SENOPATI LOT 13Jakarta2013PT. Sumber Cipta GriyaGFA : 141.500 sqmMEP Engineering Design ServicesCompleted
@DISTRICT 8 SENOPATI @SCBDJakarta2012PT Sumber Cipta Griya UtamaPT Airmas Asri709.503 m2MEP Engineering Design
Services
Completed
@SENOPATI – 2Jakarta2012PT. Sumber Cipta GriyaAirmas AsriGFA : 489.833 sqmMEP Engineering Design ServicesCompleted
@TUNJUNGAN PLAZA EXTENSION 4 & 5Surabaya2011PT. Pakuwon JatiPT. Blue AntzGFA : 116.364,4 sqmMEP Engineering Design ServicesCompleted
@MANGKULUHUR CITYJl. Jend. Gatot Soebroto, Jakarta2011PT Kencana Graha OptimaPT PTI ArchitectsOffice Tower 1 –
36 Floors : 92.158 sqm, Apartment A – 56 Floors
: 50.023 sqm, Apartment B – 36 Floor : 24.628
sqm, Total GFA : 187.634 sqm
MEP Engineering Design
Services
Construction Stage
@BAHANA OFFICE & HILTON HOTELMega Kuningan, Jakarta2011PT. Bahanasemesta CitranusantaraPT Pandega DesainTotal Gross Floor
Area: 95.000,00 sqm, Office, Retail: 59.117,60
sqm, Podium (Service Office): 2.328,00 sqm,
Parking: 29.558,80 sqm, No of Floors: 44 Floors
M&E Engineering Design ServicesTender Document Stage
@PIK AVENUEJakarta2010PT. Multi Artha PratamaPT PTI ArchitectsGFA : 109.079,4 sqmMEP Engineering Design Services
@ST. MORITZ MIXED USE DEVELOPMENTJakarta2010PT. Mandiri Cipta GemilangDP Architects/PT. Airmas AsriGFA : 729.560,74 sqmMEP Engineering Design ServicesCompleted
@SENAYAN CITYJakarta2007PT. Senayan Inti PersadaDP Architects/PT. Airmas AsriGFA : 288.850 sqmMEP Engineering Design
Services
Completed
@PARAGON CITYSemarang2006Citipoint Global Asset Management, Pte. Ltd.PT. Quadratura IndonesiaGFA : 140.000 sqmM&E Engineering Design ServicesCompleted
@MARRIOT HOTEL MEDANMedan2006PT. Kurnia Tetap MuliaGFA : 75.000 sqmMEP Engineering Design
Services
Completed
@C B D PLUIT PHASE IJakarta2006PT. Griya Mas SejatiGFA : 189.449 sqmMEP Engineering Design
Services
Completed
@THE ADHIWANGSA RESIDENCESurabaya2005PT. Adhibaladika AgungGFA : 205.092 sqmMEP Engineering Design
Services
Completed
@KELAPA GADING SQUAREJakarta2005PT. Makmur Jaya SerasiGFA : 439.336 sqmMEP Engineering Design
Services
Completed
@FX. SUDIRMANJakarta2002 - 2003PT. Ray White Project ManagementGFA : 124.090 sqmMEP Engineering Design
Services
Completed
@CENTRAL MARKET @GOLF ISLANDJakarta Utara2021PT. Kapuk Niaga IndahPT. PTI ArchitectsSite Area: 17.195 m2
Luas Bangunan:
- Plaza GF: 1.725 m2C
- Supermarket GF: 4.232 m2
- Supermarket Mezzanine: 2.014 m2
- F & B GF: 1.630 m2
- F & B Mezzanine: 3.263, 5 m2
- Public Area Mezzanine: 2.112 m2
- Kanopi (di luar Supermarket): 321,12 m2
Total GFA: 15.297, 62 m2
MEP Engineering Design
Services
Conceptual Design Stage
@MALL 23 SEMARANGJawa Tengah2020PT Indonesian Paradise Property Tbk
& Subsidiaries
GFA: 63. 424, 95
m2, Parking Area: 39.709, 17 m2
MEP Engineering Design ServicesConceptual Design Stage
@MALL IN KOTA HARAPAN INDAH BEKASIHarapan Indah Bekasi2020PT Damai Putra GroupPT Benoy ArchitectsGFA: 19.501 m2MEP Engineering Design ServicesTender Document Stage
@LIVING WORLDJl. Gatot Subroto Timur, Kel. Konja Kec.
Denpasar Utara
2018PT. Kawan Lama SejahteraPT Urban ArchitectsSite Area 32.439
m2, Retail Plaza 60.081 m2 , Retail Parking
31.110 m2, Retail Building Area 91.191 m2
MEP Engineering Design ServicesConstruction Stage
@SUMMARECON MALL BANDUNGBandung, Jawa Barat2018PT. Mahakarya Buana DamaiCadiz Internasional/PT. Anggara
Architeam
Retail Mall: 2
levels of mall of approximately: 64.919 sqm,
Ground Floor: 35.000 sqm, 1st Floor: 26.881 sqm,
Car Parking total 1.404 lot: 56.079 sqm, Hotel
18.439 sqm
MEP Engineering Design ServicesTender Document Stage
@DISCOVERY SHOPPING MALL – BALIBekasi2017PT. Bali Utama CakrawalaPT. PTI ArchitectsConstruction Floor Are: 118.334 sqm
- Parking 21.425 sqm
Lower Ground Mall 27.749 sqm
Ground Mall 14.233 sqm
Upper Ground Mall 2.253 sqm
Lower Ground Hotel 1.366 sqm
Ground Hotel 2.106 sqm
Upper Ground Hotel
MEP Engineering Design ServicesTender Document Stage
@RENOVASI PLAZA BLOK MJakarta2018PT. Pakuwon Sentosa AbadiCadiz Internasional/PT. Anggara
Architeam
Mal – 3 Level 54.000 sqm
Parking Semi Basement 17.500 sqm
Parking 535.000 sqm
F&B Area 2.500 sqm
MEP Engineering Design ServicesCompleted
@SUMMARECON MALL SERPONG (STAGE 2)Serpong, Tangerang2010PT. Summarecon Agung, Tbk.M&E Engineering Design
Services and Cogen
Completed
@GRAND GALAXY MALLBekasi2010PT. Cipta Sedayu IndahGFA: 53.112 sqmMEP Engineering Design
Services
Completed
@FX SUDIRMANJakarta2007PT. Plaza Life Style PrimaGFA: 48.625 sqmM&E Engineering Design ServicesCompleted
@PLUIT JUNCTIONJakarta2005PT. Jakarta PropertindoGFA: 50.000 sqm 8 floorsEngineering Design ServicesCompleted
@KELAPA GADING SQUARE – MALL OF
INDONESIA
Jakarta2005PT. Makmur Jaya SerasiGFA: 414.000 sqmEngineering Design ServicesCompleted
@TAMAN MINI SQUAREJakarta2004PT. Kencana Graha LestariGFA: 68.952 sqmEngineering Design ServicesCompleted
@PONDOK INDAH MALL 2Jakarta2003PT. Metropolitan Kentjana Tbk.Shopping Mall 69.678 sqm,
Basement Parking 69.954 sqm,
Engineering Design ServicesCompleted
@KELAPA GADING SQUAREJakarta2003PT. Makmur Jaya SerasiPhase II: Apartment + Hotel 143.541 Sqm
Shopping Mall 135.477 Sqm
Basement Parking 93.789 Sqm
Roof Parking 23.400 Sqm
Engineering Design Services
Tenant’s Fitout Work
Completed
@SUDIRMAN PLACEJakarta2002PT. Ray White Project ManagementApartment:44 stories, 38.374 Sqm
Office: 9 stories 5.274 Sqm
Shopping Mall: 10 stories, 46.633 Sqm
Basement Parking: 5 levels, 33.809 Sqm
Engineering Design Services
Tenant’s Fitout Work
Completed
@MEGA BEKASI HYPERMALLBekasi2002PT. Karsindo UtamaSelling Area 85.344,75 Sqm,
Hypermarket 11.756,25 Sqm, Parking 39.523,13
Sqm, Apartment 150 units
Engineering Design Services
Tenant’s Fitout Work
Completed
@GLODOK PLAZAJakarta2000PT. Multi Plaza PropertiesGFA: 62.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@INDOHANSHIN DEPARTMENT STOREJakarta1996PT. Indohanshin InternationalGFA: 26.000 sqmEngineering Design Services
Tenant’s Fitout Work
Completed
@DAAN MOGOT BARU SHOPPING MALLJakarta1996PT. Fajar Surya PerkasaGFA: 25.000 SqmEngineering Design Services
Tendering
Completed
@MAL RAYA CIPUTRA IJakarta1995PT. Citraland AdigrahaGFA: 108.000 SqmEngineering Design Services
Tendering & Supervision
Completed
@JAKARTA CONRAD HOTEL & MIXED-USE
COMPLEX
Jakarta1995PT. Jakarta International Hotels DevelopmentGFA: 62.150 SqmEngineering Design Services
Tendering & Supervision
Completed
@GAJAH MADA RETAIL CENTERJakarta1995PT. Duta Anggada RealtyGFA: 24.000 SqmEngineering Design Services
Tendering & Supervision
Completed
@MATAHARI DEPARTMENT STORE – BANCEUYBandung1994PT. Matahari Putra PrimaGFA: 23.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@MATAHARI DEPARTMENT STORE – CIPULIRJakarta1992PT. Matahari Putra PrimaGFA: 9.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@SENAYAN REDEVELOPMENT PROJECTJakarta1989 - 1991Kajima Corporation / PT. Airmas AsriGFA: 80.000 SqmEngineering Design Services
Tendering & Supervision
Completed
@SOGO – PLAZA INDONESIAJakarta1988 - 1990PT. Panin Lestari BasukiGFA: 14.340 sqmEngineering Design
ServicesTendering & Supervision
Completed
@PINTU KECIL ASEMKAJakarta1987 - 1988PT. Hutama DelkasGFA: 8.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@METRO ATOM PLAZAJakarta1986 - 1989PT. Yakin AbadiGFA: 35.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@GRAMEDIA – MELAWAIJakarta1985 - 1987PT. Han Awal & PartnersGFA: 1.600 sqmEngineering Design Services
Tendering & Supervision
Completed
@RED ROOSTERJakarta1985 - 1986Matahari Group / PT. Big EngineerGFA: 600 sqmEngineering Design Services
Tendering & Supervision
Completed
@NEW TOKO NAMSurabaya1985 - 1986Toko NamGFA: 8.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@HARCO PASAR BARUJakarta1984 - 1987PT. Duta Anggada RealtyGFA: 8.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@TUNJUNGAN PLAZASurabaya1983 - 1986PT. Parama Loka ConsultantsGFA: 40.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@GRAMEDIA – MATRAMANJakarta1983 - 1985PT. Duta Anggada RealtyGFA: 6.500 sqmEngineering Design Services
Tendering & Supervision
Completed
@SEMUT INDAH PLAZASurabaya1982 - 1986PT. Duta Anggada RealtyGFA: 21.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@HAYAM WURUK PLAZAJakarta1982 - 1987PT. Hayam Wuruk SaktiGFA: 24.000sqmEngineering Design Services
Tendering & Supervision
Completed
@MELAWAI PLAZAJakarta1981 - 1983PT. Yakin Bangun AbadiGFA: 17.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@TOMANG PLAZAJakarta1978 - 1983PT. Prasarana MargaGFA: 40.000 sqmEngineering Design Services
Tendering & Supervision
Completed
@UNIVERSITAS BAKRIEJL. HR. Rasuna Said, Jakarta Selatan2018PT Juwita Rajawali PerkasaLantai 1: 930 sqm, Lantai 2: 570 sqmMEP Engineering Design
Services
Completed
@HS LIBRARYJakarta2018Jakarta Intercultural SchoolGFA (2 Storey Building): 2.900 sqmMEP Engineering Design
Services
@MS LIBRARY RENOVATION2018GFA: 1.160 m2, 2 levelsMEP Engineering Design
Services
@MANDIRI UNIVERSITYJakarta Barat2015PT. Bank Mandiri (Persero) TbkGFA: 25.000 m2MEP Engineering Design
Services
@GUDANG GARAM LEARNING CENTERYogyakarta2015PT. Gudang Garam, TbkSite: 11.975 m2, GFA: 6.191 m2,
Outdoor Facility: 2.569 m2, Parking: 33 unit
MEP Engineering Design
Services
@SEKOLAH SATYA HARAPAN NANYANG
INTERNATIONAL – BSD
Tangerang2011GFA: 37.700 m2M&E Engineering Design Services
@FRENCH SCHOOLJakarta19882 floorsMEP Engineering Design
Services and Supervision
@BRITISH SCHOOLJakarta19882 floorsMEP Engineering Design
Services and Supervision
@SPORT MUSEUM (TMII)Jakarta19873.100 m2, 3 floorsMEP Engineering Design
Services
@SEMBUR GENIMalang19878.000 m2, 2 floorsMEP Engineering Design
Services
@NORTH SUMATRA UNIVERSITYSumatra Utara1985GFA: 3.000 m2, Library: 4 floorsMEP Engineering Design
Services and Supervision
@AIRFORCE ACADEMYYogyakarta1981TNI AU (Airforce)Electrical Ring System 20 KVMEP Engineering Design
Services
@INSTITUTE OF AGRICULTUREBogor1981GFA: 12.000 m2MEP Engineering Design
Services
@HASSANUDIN UNIVERSITYUjung Pandang1981GFA: 100.000 m2 New Campus,
Asian Development Bank Project
MEP Engineering Design
Services
@INSTITUTE OF TECHNOLOGY BOGORBogor1981GFA: 200 Ha
@INSTITUTE OF TECHNOLOGY BANDUNGBandung1979GFA: 14.000 m2, Laboratory of
Mechanical Department
MEP Engineering Design
Services and Supervision
@INSTITUTE OF TECHNOLOGY SURABAYASurabaya1997GFA: 48.000 m2, Laboratories &
Teaching Block
MEP Engineering Design
Services and Supervision
@CIPTO MANGUNKUSUMO HOSPITALJakarta1979 – 1981GFA: 4.000 sqm, Cardiovascuker
Department
MEP Engineering Design
Services
Completed
@TELOGOREJO HOSPITALSemarang1979GFA: 500 sqm, Operating Theater
& ICU
MEP Engineering Design
Services
Completed
@SELONG HOSPITALLombok Timur1980GFA: 3.000 sqm, Public Health
Center
MEP Engineering Design
Services
Completed
@MATARAM HOSPITALLombok Timur1980GFA: 3.600 sqm, Public Health
Center
MEP Engineering Design
Services
Completed
@DR. KARIYADI HOSPITALSemarang1979 – 1981GFA: 4.000 sqm, Outpatient
Department
MEP Engineering Design
Services
Completed
@HARAPAN KITA HOSPITALJakarta1980 – 1982GFA: 20.000 sqm, Cardiac CenterMEP Engineering Design
Services
Completed
@SUMBER WARAS HOSPITALJakarta1981600 BedsMEP Engineering Design
Services
Completed
@PELAMONIA HOSPITALUjung Pandang1983 – 1986Military HospitalGFA: 12.000 sqmMEP Engineering Design
Services
Completed
@RSPAD GATOT SUBROTOJakarta1987 – 1988Renovation or Air Conditioning InstallationGFA: 60.000 sqmMEP Engineering Design
Services
Completed
@ONGKO MULYO HOSPITAL
(OMNI INTERNATIONAL HOSPITAL)
Jakarta1990 – 1991PulomasNot of Floors: 2 FloorsMEP Engineering Design
Services
Completed
@GRAHA MEDICAL HOSPITAL EXTENSIONKebon Jeruk, Jakarta1993PT Baligraha Medikatama50 RoomsMEP Engineering Design
Services
Completed
@INTERNATIONAL HOSPITAL SURABAYASurabaya1995PT Ready Indah140 BedsMEP Engineering Design
Services
Completed
@MEDIKA BSD HOSPITALSerpong, Tangerang1996PT Optima Dipa Medika160 BedsMEP Engineering Design
Services
Completed
@INTERNATIONAL BINTARO JAYA HOSPITALBintaro, Jakarta1996PT Putramas Muliasantosa (J.V. HCOA
&Kalbe)
200 – 300 BedsMEP Engineering Design
Services
Completed
@INTERNATIONAL HOSPITAL SURABAYA –
EXTENSION
Surabaya2002PT Ready Indah150 BedsMEP Engineering Design
Services
Completed
@SILOAM HOSPITAL (KEMANG VILLAGE)Kemang, Jakarta2008PT LIPPO Karawaci, TbkGFA: 18.485 sqm, Not of Floors: 10
Floors, Basement: 7.825 sqm, Not of Floors: 3 Floors
MEP Engineering Design
Services
Completed
@MMC HOSPITAL EXTENSIONJL. HR Rasuna Said, Jakarta2009PT Kosala Agung MetropolitanGFA: 66.000 sqm, 30 Floors,
Basement: 2 Floors
MEP Engineering Design
Services
Completed
@SILOAM MAKASSAR HOSPITALMakassar2010LIPPO GroupGFA: 9.514 sqm, Not of Floors: 7
Floors
MEP Engineering Design
Services
Completed
@SILOAM SIMATUPANG HOSPITALJl. TB Simatupang, Jakarta2011LIPPO GroupGFA: 5.443.02 sqm, Not of Floors:
15 Floors
MEP Engineering Design
Services
Completed
@SILOAM PALEMBANG HOSPITALPalembang2011LIPPO GroupGFA: 15.837.5 sqm, Not of Floors:
5 Floors
MEP Engineering Design
Services
Completed
@SILOAM MEDAN HOSPITALMedan2013GFA: 29.497 sqm, Not of Floors: 13
Floors
MEP Engineering Design
Services
Completed
@MAYAPADA HOSPITALJL. Lebak Bulus 1, Jakarta Selatan2017Nirmala Kencana MasGFA: 23.549.07 sqm, Not of Floors:
13 Floors
MEP Engineering Design
Services
Completed
@BINTARO HOSPITALBintaro, Jakarta2018PT Gunung Halimun ElokGFA :32.021 sqmMEP Engineering Design
Services
Conceptual Design Stage
@PT NATTERMANCibinong1987Demin Water System, Water Tank System200.000 LitersMEP Engineering Design ServicesCompleted
@PT SANDOZ CHEMICAL INDONESIA
(NOVARTIS)
Tangerang1991Chemical Masterbatch BuildingGFA : 6.000 m2MEP Engineering Design
Services
Completed
@UNILEVER INTAN PROJECTJakarta1995PT Unilever IndonesiaGFA : 60.000 m2, Not of Floors : 6
Floors
MEP Engineering Design Services
@PHARMACEUTICAL FACTORIESPalembang1997PT Dexa MedicaGFA: 7.299 m2, Extension: 2 FloorsMEP Engineering Design Services
@SOHO INDUSTRI PHARMASIJakarta2006PT Soho Industri PharmasiGD 3 BuildingMEP Engineering Design ServicesCompleted
@PERFETI VAN MELLE (CANDY FACTORY
EXTENSION)
Cikarang, Jawa Barat2006PT Van Melle Indonesia, TbkGFA : 27.129 m2, 5 BlocksMEP Engineering Design ServicesCompleted
@PERFETI VAN MELLE (IMPROVEMENTF OR
COOLING TUNNEL)
Cileungsi2009PT Van Melle Indonesia TbkGFA : 842 m2MEP Engineering Design ServicesCompleted
@ARGHA KARYA (BOPP – LINE 6)Citeurep, Cibinong, Bogor2009PT Argha Karya Prima Industry, TbkGFA : 12.214 m2MEP Engineering Design ServicesCompleted
@SUPERNOVA (IMPROVEMENT FOR
VENTILATION SYSTEM)
Cikarang Baru, Bekasi2010PT Supernova FlexibleGFA : 1.291 m2MEP Engineering Design ServicesCompleted
@INDOPOLY SWAKARSA INDUSTRY
(BOPET – LINE 3)
Dawuan, Purwakarta2010PT INDOPOLY SWAKARSA INDUSTRI, TbkGFA : 16.498 m2MEP Engineering Design ServicesCompleted
@PERFETI VAN MELLE (HACCP)Cikampek2012PT Van Melle Indonesia, TbkGFA : 1.327 m2MEP Engineering Design ServicesCompleted
@PT SAT NUSAPERSADA (POWER HOUSE )Batam2019PT Sat Nusapersada, TbkGFA : 1.327 m2MEP Engineering Design ServicesCompleted